Scott Jellison
Chief Executive Officer
Get their honest, personalized take on your startup.
Sign in to pitch Scott →At a glance
- Full Name
- Scott W. Jellison, P.E.
- Title
- Chief Executive Officer, The Metropolitan District (MDC)
- Firm
- The Metropolitan District (a.k.a. Metropolitan District Commission / "MDC")
- Firm Type
- Public / municipal water and wastewater utility — a non-profit municipal corporation chartered by the Connecticut General Assembly in 1929. This is not an angel-investment firm; the "Angel Investors / Seed Round" label in the source stub is a data-aggregator misclassification and is not supported by any evidence.
- Sector Focus
- Drinking water and wastewater (sewer) collection and treatment; large-scale water infrastructure and construction
- Geographic Focus
- Greater Hartford region, Connecticut (eight member towns plus service to surrounding communities)
- Location
- Hartford, Connecticut, USA
Background
Scott W. Jellison is the Chief Executive Officer of The Metropolitan District (MDC), the regional non-profit municipal utility that provides drinking water and wastewater services to the greater Hartford, Connecticut area. He is a licensed Professional Engineer (P.E.), earning a Bachelor of Science in Mechanical Engineering from the University of Hartford in 1987 and his P.E. license in 1992.
Before joining the MDC, Jellison served as Director of Project Management for the Department of Public Works, State of Connecticut, where he oversaw an approximately $200 million-per-year design and construction program supporting more than 72 state agencies. In that role he was Project Director for what was described as the largest redevelopment project in Connecticut history (~$1 billion), which included Rentschler Field (the UConn football stadium), the Capital Community College downtown campus in the former G. Fox building, and the Connecticut Convention Center.
He joined the MDC in September 2006 as Chief Operating Officer. On January 1, 2011 he became Deputy CEO of Engineering and Operations, and in February 2015 he was appointed Chief Executive Officer. As CEO he leads a senior team that includes Chris Levesque (COO), Kelly Shane (CAO), Jonathan M. Perugini (CFO), and Christopher R. Stone (District Counsel).
Under Jellison's leadership, the MDC has advanced Hartford's multi-billion-dollar Clean Water Project — a long-term program (managed with CDM Smith) to reduce combined sewer overflows and protect the Connecticut River — whose flagship element is the South Hartford Conveyance and Storage Tunnel (SHCST), targeted for completion around 2029. He was named AGC Connecticut's "Public Owner of the Year" in 2017 and was elected to the board of directors of Operation Fuel (a Connecticut energy-assistance non-profit) in October 2020.
Investment Thesis & Focus
- No evidence was found that Scott Jellison operates as an angel investor, venture investor, or seed-stage funder. Publicly available sources describe him solely as a public-utility executive and Professional Engineer.
- His professional "focus" is capital infrastructure: financing and delivering large water, wastewater, and public-works construction programs through the MDC's public budgeting and municipal-bond mechanisms (e.g., the October 2025 MDC bond issuance) rather than private-company equity investing.
- Founders seeking a seed-stage angel check should treat the source stub's "Seed Round / Check Size / Target Company Profile" fields as unverified/incorrect — none could be substantiated.
Notable Investments
- No private-company or startup investments attributable to Scott Jellison were found in any source. The label of "portfolio companies" does not apply to a municipal utility CEO. Instead, his notable *programs/projects* include:
- Clean Water Project (Greater Hartford) — multi-billion-dollar program to control combined sewer overflows and protect the Connecticut River; managed in partnership with CDM Smith.
- South Hartford Conveyance and Storage Tunnel (SHCST) — the deep-rock storage tunnel that is the centerpiece of the Clean Water Project; reached a major construction milestone and is targeted for completion ~2029.
- Prior (pre-MDC) state projects — Rentschler Field/UConn stadium, Capital Community College (G. Fox building), and the Connecticut Convention Center.
Unlock the full research
Get how to approach them, recent activity, sources, contact links — plus pitch their AI twin for a candid read on your raise.
One-time. Stays unlocked for you.